EasyManua.ls Logo

Generac Power Systems RTG24SHA1 User Manual

Generac Power Systems RTG24SHA1
32 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Owner’s Manual
For
Automatic Transfer Switch
with Integrated Load Center
100–200 Amp, Service Entrance
Model Number
RTG24SHA1 (100A)
RTG42SHA1 (200A)
Register your Generac product at:
WWW.GENERAC.COM
888-436-3722
Para español , visita:
http://www.generac.com/servicesup port/productsupportlookup
SAVE THIS MANUAL FOR FUTURE REFERENCE
MODEL NUMBER: _________________________
SERIAL NUMBER: _________________________
DATE PURCHASED:________________________

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Generac Power Systems RTG24SHA1 and is the answer not in the manual?

Generac Power Systems RTG24SHA1 Specifications

General IconGeneral
BrandGenerac Power Systems
ModelRTG24SHA1
CategorySwitch
LanguageEnglish

Summary

Section 1: Introduction and Safety

Safety Rules

Manufacturer's disclaimer on safety and user responsibility.

Safety Symbols and Meanings

Explains DANGER, WARNING, CAUTION, and NOTE symbols.

Electrical Hazards

Details specific electrical risks and associated warnings.

General Hazards

Outlines various general risks and safety precautions.

Section 2: General Information

Safe Use of Transfer Switch

Essential safety rules and publications for using the transfer switch.

Smart A/C Module (SACM)

Explanation of the SACM for managing air conditioner loads.

Smart Management Module (SMM) (Sold Separately)

Description of the SMM for managing multiple loads.

Section 3: Installation

Introduction to Installation

Overview of factory-wired and tested installation procedures.

Install Breakers

Step-by-step instructions for installing breakers.

Installing Branch Circuit Conductors

Instructions for connecting branch circuit conductors.

Connecting Power Source and Generator Power Supply

Procedure for connecting utility and generator power supplies.

Connecting Smart A/C Module (SACM)

Procedure for controlling an air conditioner with the SACM.

Section 4: Operation

Functional Tests and Adjustments

Steps for verifying installation and performing functional tests.

Generator Tests Under Load

Procedure for testing generator operation under load.

Checking Automatic Operation

Procedure to test the system's automatic transfer capabilities.

Related product manuals