EasyManuals Logo

Getinge ISOTEST User Manual

Getinge ISOTEST
74 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #23 background imageLoading...
Page #23 background image
GETINGE-LA CALHENE ISOTEST | User manual
NTA
3015/78 C
Approuvé informatiquement / Electronic signature
DEX | Page 23/
74
8. OPERATION
8.1. TRANSFER SYSTEM
The unit is equipped with two DPTE® ALPHA 190 transfer systems, one of which is fixed
to the work top of the work station allowing the connection of a DPTE-DispoBagTM
transfer system to ensure safe evacuation of liquid/solid waste. The other one is fixed to
the vertical wall for connecting the Tubing system for evacuating tests.
Once the Beta part or parts are connected, the double door or doors can be opened by
turning the lever.
Each one of the two work stations (facing each other) can be equipped with these
DPTE® transfer systems.
It consists of two parts:
Number Designation
1 DPTE-S® 190 (Alpha part)
2 Dummy container (Beta part) – (optional)
1

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Getinge ISOTEST and is the answer not in the manual?

Getinge ISOTEST Specifications

General IconGeneral
BrandGetinge
ModelISOTEST
CategoryTest Equipment
LanguageEnglish