EasyManua.ls Logo

Getinge ISOTEST - Operation and Process Control; Transfer System

Getinge ISOTEST
74 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GETINGE-LA CALHENE ISOTEST | User manual
NTA
3015/78 C
Approuvé informatiquement / Electronic signature
DEX | Page 23/
74
8. OPERATION
8.1. TRANSFER SYSTEM
The unit is equipped with two DPTE® ALPHA 190 transfer systems, one of which is fixed
to the work top of the work station allowing the connection of a DPTE-DispoBagTM
transfer system to ensure safe evacuation of liquid/solid waste. The other one is fixed to
the vertical wall for connecting the Tubing system for evacuating tests.
Once the Beta part or parts are connected, the double door or doors can be opened by
turning the lever.
Each one of the two work stations (facing each other) can be equipped with these
DPTE® transfer systems.
It consists of two parts:
Number Designation
1 DPTE-S® 190 (Alpha part)
2 Dummy container (Beta part) – (optional)
1