EasyManuals Logo

Getinge ISOTEST User Manual

Getinge ISOTEST
74 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #39 background imageLoading...
Page #39 background image
GETINGE-LA CALHENE ISOTEST | User manual
NTA
3015/78 C
Approuvé informatiquement / Electronic signature
DEX | Page 39/
74
If the verification of the bottle is correct, the following window appears. The test
phase starts.
If the test phase is correct, the following phases then succeed one another
automatically (see steps 10 and 11).
If the cycle takes place without any faults and the test is declared non-
compliant, the following window appears:
Check the tightening of the clamps, cable glands and hose attachments.
Press "stop airlock" and return to step 7.
If the fault continues, consult the Getinge After-Sales Service Centre for your
region.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Getinge ISOTEST and is the answer not in the manual?

Getinge ISOTEST Specifications

General IconGeneral
BrandGetinge
ModelISOTEST
CategoryTest Equipment
LanguageEnglish