EasyManuals Logo

Getinge ISOTEST User Manual

Getinge ISOTEST
74 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #42 background imageLoading...
Page #42 background image
GETINGE-LA CALHENE ISOTEST | User manual
NTA
3015/78 C
Approuvé informatiquement / Electronic signature
DEX | Page 42/
74
Step 15: The airlock door is closed. The airlock is in loading phase.
The airlock is not sterile.
The following animation appears:
When the load is inserted, the operator can close the airlock door.
Step 16: The airlock door is closed. The airlock is in loading phase.
The airlock is not sterile. The operator can still open the airlock door (if opened,
the animation in step 12 is displayed).
If the test phase is still valid, the following animation appears:

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Getinge ISOTEST and is the answer not in the manual?

Getinge ISOTEST Specifications

General IconGeneral
BrandGetinge
ModelISOTEST
CategoryTest Equipment
LanguageEnglish