EasyManua.ls Logo

Getinge ISOTEST - Page 41

Getinge ISOTEST
74 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GETINGE-LA CALHENE ISOTEST | User manual
NTA
3015/78 C
Approuvé informatiquement / Electronic signature
DEX | Page 41/
74
The operator can transfer the load to the isolator.
After transferring the load to the isolator, the operator can close the door again.
Step 14: The isolator door is closed. The airlock is in loading phase.
The airlock is not sterile; the door of the airlock can be opened.
The following animation appears:
After opening the door of the airlock, the operator can insert the load.