EasyManuals Logo

Getinge Lucea 50 Maintenance Manual

Getinge Lucea 50
44 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #21 background imageLoading...
Page #21 background image
Maintenance and inspection procedures
Mechanical inspections
4
Lucea 50_100
01740 EN 01
21 / 44
Fig.18: Fitting of cover
Check that the cover is firmly in place.
Fig.19: Replacing the screws
As a preventive measure, every six years,
replace the screws securing the suspen-
sion tube to the anchor plate, as well as
the screws for the suspension end caps.
Tighten to specified torque; use pre-glued
screws.
Fig.20: Checking the rigidity
Check the rigidity of the configuration by
shaking the assembly.

Other manuals for Getinge Lucea 50

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Getinge Lucea 50 and is the answer not in the manual?

Getinge Lucea 50 Specifications

General IconGeneral
BrandGetinge
ModelLucea 50
CategoryMedical Equipment
LanguageEnglish

Related product manuals