EasyManuals Logo

Getinge Lucea 50 Maintenance Manual

Getinge Lucea 50
44 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #25 background imageLoading...
Page #25 background image
Maintenance and inspection procedures
Electrical inspection
4
Lucea 50_100
01740 EN 01
25 / 44
4.4.2 Checks
Fig.30: Lubricating the suspension
Lubricating the suspension under the slip
ring
1. Remove the mounting screw.
2. Raise the screw cover.
3. Spray lubricating grease at the location of
the screw cover.
Fig.31: Lubricating the spring arm
Lubricating the spring arm under the slip
ring
1. Remove the mounting screw.
2. Raise the screw cover.
3. Spray lubricating grease at the location of
the screw cover.
4.5 Electrical inspection
Ceiling-mounted power supply output voltage (24V)
Mobile and wall-mounted power supply output voltage (28 V)
Check the tightening of the wires in the terminal blocks
Check that the power supply is connected to earth.
Check the condition of the batteries (swelling, oxidised terminals, etc.)
Check the battery voltage.

Other manuals for Getinge Lucea 50

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Getinge Lucea 50 and is the answer not in the manual?

Getinge Lucea 50 Specifications

General IconGeneral
BrandGetinge
ModelLucea 50
CategoryMedical Equipment
LanguageEnglish

Related product manuals