1.2 Safety notices
à The mandatory installation, maintenance and repair work must be performed by properly trained personnel
authorised by GEZE.
à The country-specific laws and regulations are to be observed during safety technology tests.
à GEZE is not liable for any injuries or damage whatsoever resulting from unauthorised changes to the system.
à Furthermore, only original GEZE parts may be used for repair and maintenance work.
à The connection to the mains voltage must be made by a professional electrician. Perform the power connec-
tion and protective earth connection test in accordance with VDE 0100 Part 610.
à Use an on-site automatic cut-out as the line-side disconnecting device, the dimensioning of which is matched
to the type, cross-section, type of routing and ambient conditions of the on-site power supply circuit. The
automatic cut-out must have at least 4A and max. 16A.
à In compliance with Machinery Directive (2006/42/EC), a risk analysis must be performed and the door system
identified in accordance with CE Marking Directive 93/68/EEC before the door system is commissioned.
à Observe the latest versions of guidelines, standards and country-specific regulations, in particular:
à ASR A1.7 “Guidelines for doors and gates”
à DIN 18650 “Building hardware - Powered pedestrian doors”
à Accident-prevention regulations, especially BGV A1 “General regulations” and BGV A2 “Electrical installa-
tions and equipment
à VDE0100; Part 610 "Erection of low-voltage installations"
à DIN EN 60335-2-103 "Household and similar electrical appliances; Particular requirements for drive units for
gates, doors and windows"
à The relevant regional building regulations must be consulted with regard to widths of rescue routes.
1.3 Safety-conscious working
à Secure workplace against unauthorised entry.
à Use only the cables specified on the cable plan provided. Cables must be shielded in compliance with the
wiring diagram.
à Secure loose, internal drive cables with cable ties.
à Before working on the electrical system:
à disconnect the drive from the 230-V mains and check to ensure that it is not supplied with power.
à disconnect the control unit from the 24-V rechargeable battery.
à Note that if an uninterruptible power supply (UPS) is used, the system will still be supplied with voltage
despite the fact that the power supply is disconnected.
à Always use insulated wire-end ferrules for wire cores.
à Attach safety stickers to glass leaves.
à Danger of injury due to glass breakage.
à Danger of injury due to sharp edges in the drive.
1.4 Inspection of the installed system
Measures for protection and prevention of pinching, impact, shearing or drawing-in spots:
à Check the function of security sensors and movement detectors.
à The detection area of the movement detector in the direction of the emergency exit must cover the opening
width x 1.5 m in front of the door.
à Check protective earth connection to all metal parts that can be touched.
à Perform a safety analysis (risk analysis).
1.5 Environmentally conscious working
The door system is made up of materials that should be sent for recycling.
For this purpose, the individual components should be sorted corresponding to material type:
à Metal
à Plastic
à Electronics
à Cables
The parts can be disposed of at the local recycling depot or by a scrap recycling company.

Other manuals for GEZE ECturn Inside

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GEZE ECturn Inside and is the answer not in the manual?

GEZE ECturn Inside Specifications

General IconGeneral
BrandGEZE
ModelECturn Inside
CategoryDoor Opening System
LanguageEnglish

Related product manuals