ECturn Inside
7
Scope of delivery
4 Scope of delivery
installation in the door leaf is shown, installation in the door frame is also possible
4.1 Overview
1 Cover for the motor gear unit
2 Back check (mat.no.129343)
3 Guide rail and lever with installation material
4 separate programme switch (optional)*
5 Fixture for rechargeable battery (optional)
6 Rechargeable battery (optional)
7 Control unit
8 Motor gear unit
9 Power supply cable 2.5 m
10 Electric installation material
11 Drip loop (optional)
12 Power supply cable (on site) max. 20m long
13 Power supply
*) alternatively, the separate programme switch can be placed further away from the control unit with a 1 m cable