10.10 Flue Fitting
Remove the ue elbow.
Separate the ue duct from the terminal by twisting to release
the terminal catch, then pull out of the retaining seal, refer to
diagram 10.17.
The ue duct cutting length (L + 11mm.) is shown in diagram
10.17.
The air duct should be cut at the opposite end to the terminal
The plastic ue duct MUST be cut at the opposite end to the
terminal catch.
The plastic ue duct extensions MUST be cut at the opposite
end to seal.
The cut ducts must be de-burred and all lings and debris
removed.
Insert the ue duct into the air duct terminal assembly,
remembering to engage the catch within the terminal.
NOTE: If the seals require lubricant to ease installation, do
not use mineral oils or grease, only silicon grease or water is
recommended.
Fit the sealing collar behind the locating lugs on the ue
terminal, see diagram 10.18.
Push the ue assembly into the wall, externally or internally,
initially until the end of the assembly protrudes a short way
from the inside face of the wall. This will enable the internal
trim ring (if required) to be positioned and allow the ue
assembly to be drawn back into the ue elbow.
Secure the ue elbow in position on top of the boiler with four
torque headed screws supplied.
Draw the ue assembly from wall and engage the ue duct
into the elbow and butt t between the air duct and ue elbow.
Ensuring the correct alignment of the terminal.
Fit the securing collar into position, mark through two of the
pre drilled holes in the securing collar. Remove securing
collar and drill two 3mm diameter holes one in the elbow and
one in the air duct, take care not to pierce the inner ue duct.
Fit the securing collar and secure with screws provided, see
diagram 10.18.
Slide the internal trim ring back against the wall, securing in
place with a small amount of sealant if required.
NOTE: If the air and ue ducts have been correctly cut to the
instructions the sealing collar should t ush with the outside
wall, check this.
Diagram 10.17
12847
10 Standard Flue - Length, Preparation and Installation
Diagram 10.18
12658

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Glow-worm Flexicom 12hx and is the answer not in the manual?

Glow-worm Flexicom 12hx Specifications

General IconGeneral
BrandGlow-worm
ModelFlexicom 12hx
CategoryBoiler
LanguageEnglish

Related product manuals