Once the wiring and configuration work is done, fix
the frame to the embedding box using the screws
supplied.
Closing the frame:
Important: Before closing the door panel(s) make a
test call to any apartment to ensure that everything
works correctly.
29
Inserting the button identiļ¬cation labels:
Open the label
holder window.
Place the label
and close.
INSTALLATION OF THE DOOR PANEL
NEXA MODULAR G2+ AUDIO AND VIDEO DOOR ENTRY SYSTEM - BUILDING