EasyManua.ls Logo

GÖLZ MS 400 - 6 Maintenance and Care; Machine; Blade

GÖLZ MS 400
58 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
MS400
Translation of the original operating instruction and spare parts list
- 30-
5007045-00
BA-E
®
6. Maintenance and care
Spare parts must comply with the technical requirements specified by the manufacturer. Spare parts
from GÖLZ
®
can be relied to do so! Observe the following indications:
In accordance to the given cycles, the subsequently described maintenance work has to be enforced.
Also the wearing parts subject to no certain maintenance-intervals have to be checked regularly for
wear and to adjust if necessary or to exchange.
Before
starting work
After work Weekly
In the event of a
malfunction
If damaged
Complete machine
check
x
x x
clean
x
Flange
clean
x
replace
x
Engine shaft clean
x
Engine (housing and
fan)
clean
x
Water tank clean
x
Water pump
check
x x
clean
x
Water hoses deplete
x
Water nozzle clean
x
Guiding rail and
guiding roller
clean
x
Screw fittings check
x
6.1 Machine
Clean the machine after each duty and check all functions. Replace all necessary parts that are out of
order or worn out immediately.
6.2 Blade
When ending a cutting job - check blade as follows:
Check segments for cracks or break-outs, Cracks between segment and core barrel,
Deformation and out of round wear.
In case of doubt, send the blade for repair.
Attention: All maintenance, repair and care work is only to be done if the motor
being stopped and the power supply is disconnected!

Table of Contents

Related product manuals