MS400
Translation of the original operating instruction and spare parts list
- 30-
5007045-00
BA-E
®
6. Maintenance and care
Spare parts must comply with the technical requirements specified by the manufacturer. Spare parts
from GÖLZ
®
can be relied to do so! Observe the following indications:
In accordance to the given cycles, the subsequently described maintenance work has to be enforced.
Also the wearing parts subject to no certain maintenance-intervals have to be checked regularly for
wear and to adjust if necessary or to exchange.
Before
starting work
After work Weekly
In the event of a
malfunction
If damaged
Complete machine
check
x
x x
clean
x
Flange
clean
x
replace
x
Engine shaft clean
x
fan)
clean
x
Water tank clean
x
Water pump
check
x x
clean
x
Water hoses deplete
x
Water nozzle clean
x
guiding roller
clean
x
Screw fittings check
x
6.1 Machine
Clean the machine after each duty and check all functions. Replace all necessary parts that are out of
order or worn out immediately.
6.2 Blade
When ending a cutting job - check blade as follows:
Check segments for cracks or break-outs, Cracks between segment and core barrel,
Deformation and out of round wear.
In case of doubt, send the blade for repair.
Attention: All maintenance, repair and care work is only to be done if the motor
being stopped and the power supply is disconnected!