14
In case that more
than 5m.
SERVICE
Torque Wrench Requirements for installation
Cable Connection
Pipe Length & Elevation Requirements
CAUTION: Capacity is based on standard length and maximum allowance length is based on reliability. Oil trap should
be installed every 16.4 feet - 22.07 feet (5 - 7 meters.)
(16 Feet)
The power cord or cable connection
should be selected according to this
specification table.
Torque Torque
mm Inch Lbs. per ft. Kg.m
ϕ6.35
1/4 13 1.8
ϕ9.52
3/8 30 4.2
ϕ12.70
1/2 40 5.5
ϕ15.88
5/8 48 6.6
ϕ19.05
3/4 48 6.6
Outside Diameter
12 18 24
mm
2
1.0 1.5 2.5
AWG
14 14 12
Unit Size
Line Set Length Max. Additional Refrigerant
Provided Length Per foot
Vapor Liquid with Unit Elevation Overall of Additional Line
BTUH/h Inches (m) Inches (m) Feet (m) B Feet (m) A Feet (m) Oz. (g/m)
12k
1/2" (ϕ12.7) 1/4" (ϕ6.35)
16 (5) 16 (5) 32 (10) 0.3 oz. (30)
5/8" (ϕ12.7) 1/4" (ϕ6.35)
16 (5) 32 (10) 65 (20) 0.3 oz. (30)
5/8" (ϕ12.7) 3/8" (ϕ9.52)
16 (5) 32 (10) 65 (20) 0.6 oz. (30)
Capacity
Max
18k - 24k
Pipe Size