EasyManuals Logo

Goodwe GW8KAU-DT User Manual

Goodwe GW8KAU-DT
74 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #21 background imageLoading...
Page #21 background image
17
User Manual V1.0-2022-01-17
05 Installation
Installation Angle Requirements
Install the inverter vertically or at a maximum back tilt of 15 degrees.
Do not install the inverter upside down, forward tilt, back forward tilt, or horizontally.
The following tools are recommended when installing the equipment. Use other auxiliary tools on
site if necessary.
Installation Tool Requirements
Goggles Safety shoes Safety gloves Dust mask
RJ45 crimping
tool
Diagonal
pliers
Marker Level Heat shrink
tube
Rubber
hammer
DC wiring
wrench
Vacuum
cleaner
Torque wrench
Cable tieMultimeter
Wire
stripper
Hammer
drill
Heat gun
DC terminal
crimping tool
M3/M5

Other manuals for Goodwe GW8KAU-DT

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Goodwe GW8KAU-DT and is the answer not in the manual?

Goodwe GW8KAU-DT Specifications

General IconGeneral
Number of MPPT2
THDi<3%
AC Grid Frequency50/60Hz
Grid Frequency Range45-55Hz / 55-65Hz
Peak Efficiency98.3%
Protection DegreeIP65
Rated Power8000W
Max. DC Power12000W
Max. DC Input Power12000W
Rated AC Power8000W
Rated AC Voltage230V
AC Voltage Range180-280 V
Power Factor0.8 leading to 0.8 lagging
Operating Temperature Range-25°C to 60°C

Related product manuals