EasyManua.ls Logo

Gorilla Playsets Landing - Page 64

Default Icon
81 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Step 35: Roof Starters/Roof Peak
1: Place the 1 x 5 x 52” (groove only) Roof Starter Boards at the peak of the roof. The
holes in the Roof Starters should be centered on the Roof Supports. The at side of the
Roof Starters should be placed as close together as possible near the peak without the
boards overlapping.
2: Fasten the Roof Starter Boards to the Roof Supports with 1-1/2” wood screws.
3: Place the 3-1/2 x 3-1/2 x 52” Roof Peak on top of the Roof Starter Boards and fasten
with four 1-1/2” wood screws.
3-1/2 x 3-1/2 x 52”
Roof Peak
1 x 5 x 52”
Roof Starter
1-1/2” Wood Screw
Roof Supports
Page 64
®

Related product manuals