Shutdown
Shutdown
Shutdo wn system to avoid electric shock. All
electrical wiring must be done b y a qualified
electrician and comply with all local codes and
regulations. To help prevent serious injury from
pressurized uid, such as skin injection, splashing
fluid and moving parts, follow the Pressure Relief
Procedure when y ou s to p sp ray ing and b efore
cleaning, checking, or servicing equipment.
NOTICE
Proper system setu p, startup, and shutdown
procedures are critical to electrical equipment
reliabil ity . Th e fol low ing p rocedures ensure s tead y
voltage. Failure to follow these procedures will
cause voltage uctuations that can damage
electrical equipment and void the warranty.
1. Press to stop the pumps.
2. Turn of
f all heat zones.
3. Relieve pressure. See
Pressure Relief Procedure, page 43.
4. Press to park the Component A Pump. The
park operation is complete when green dot goes
out. Verify the park operation is complete before
moving to next step.
5. Press to deactivate the system.
6. Turn off the air compressor, a ir dryer, and
breathing air.
7. Turn main power switch OFF.
To prevent electric shock do not remove any
shrouds or open the electrical enclosure door.