7. Turn on air supply. Set main pump air regulator (CD)
to 20 psi (138 kPa 1.38 bar).
8. Use manual pump run mode.
NOTE: When run independently set to or
.
Press and as needed to prime. Monitor
containers to avoid overflow.
9. Select Pump A . Press . Slowly turn
main pump air regulator (CD) clockwise to increase
air pressure until pump A starts. Dispense into pail
until clean fluid comes out of A. Close recirculation
valve.
When priming or flushing pumps, it is normal to get
cavitation or pump runaway alarms. Clear alarms ,
and press again as necessary. These alarms
prevent excessive pump speeds, which will damage
pump packings.
10. Move recirculation line back to hopper.
11. Repeat for B side.
12. Dispense a small amount of each material through
both sampling valves (AE, AF).
NOTE: Open sampling valves slowly to avoid splashing.
13. Close both sampling valves (AE, AF).
NOTE: If a remote mix manifold is used, disconnect A
and B hoses at remote mix manifold. Prime the A and B
fluid lines with material. Reconnect hoses to remote
manifold.
NOTE: If a recirculation remote mix manifold kit
(273185) is used, see XM Mix Manifold Kits manual,
(Related Manuals, page 3).
CD
AFAE