EasyManua.ls Logo

Grant QR Range - Commissioning Procedures and System Checks

Grant QR Range
44 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 40 Appendix C: Installation, Commissioning and Service Record Log Book
! NOTE !
IT IS THE RESPONSIBILITY OF THE INSTALLER TO COMPLETE THIS LOGBOOK AND PASS IT ON TO THE CUSTOMER,
FAILURE TO DO SO MAY INVALIDATE THE CYLINDER GUARANTEE.
Appliance and Time Control Details
Manufacturer GRANT UK Model
Capacity Litres Serial No.
Type Unvented
Time Control
Programmer or Time Switch
COMMISSIONING PROCEDURE INFORMATION
Heat Source Primary Settings (indirect heating only)
Is the primary a sealed or open vented system? Sealed Open
What is the primary heat source ow temperature? _________________________ °C
Incoming Water Supply Information
What is the incoming static cold water pressure at the inlet to the pressure reducing valve? _________________________ Bar
Has strainer (if tted) been cleaned of installation debris? YES NO
Has a water scale reducer been tted? YES NO
What type of scale reducer has been tted?
Hot Water Cylinder Information
Are combined temperature and pressure relief valve and expansion valve tted and discharge tested? YES NO
Is primary energy source cut out tted (normally 2-Port valve)? YES NO
What is the pressure reducing valve setting (if tted)? _________________________ Bar
Where is operating pressure reducing valve situated?
Has the expansion vessel or internal air space been checked? YES NO
What is the hot water temperature at the nearest outlet? _________________________ °C

Table of Contents

Related product manuals