GMV5 D.C INVERTER MULTI VRF SERVICE MANUAL
130
The system detects
communication failure between
master unit and inverter fan
driver.
The rated capacity ratio is
over-high between IDUs and
ODUs.
The rated capacity ratio is
over-low between IDUs and
ODUs.
The system completes detection
and automatically enters the next
step.
06_Internal
component
detection for
basic modules
The system detects component
failure of ODU.
The system detects that no ODU
component fails and automatically
enters the next step.
07_Component
detection for
IDU
XXXX/
Corres
pondin
g fault
code
The system detects component
failure of IDU. "XXXX" indicates
the project number of the faulty
IDU. The corresponding fault
code is displayed after three
seconds. For example, if a d5
fault occurs on IDU 100, LED3 will
circularly display "01", "00" (two
seconds later), and "d5" (two
seconds later).
The system detects that no IDU
component fails and automatically
enters the next step.
08_Compresso
r preheating
confirmation
The system gives a prompt if the
compressor preheating period is
less than eight hours.
The system detects that the
compressor preheating period is
more than eight hours and
automatically enters the next
step.
09_Pre-startup
refrigerant
detection
The system detects insufficient
refrigerants and stops to balance
the pressure lower than 0.3 MPa.
The system detects that
refrigerants are normal and
automatically enters the next
step.
10_Pre-startup
ODU valve
status detection
Outdoor unit valves are being
opened.
Outdoor unit valves have not
been completely opened.
Outdoor unit valves have been
properly opened.
11_Manually
calculated
refrigerant
perfusion status
The refrigerant perfusion status is
manually calculated (appended
refrigerants must be accurately
calculated).
12_Unit
commissioning
startup
confirmation
The system waits for a unit
commissioning startup command.
The unit is set to
manually-calculated refrigerant
perfusion commissioning
operation status.