EasyManuals Logo

Gree GMV-120WM/B-F Service Manual

Gree GMV-120WM/B-F
424 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #230 background imageLoading...
Page #230 background image
GMV5 D.C INVERTER MULTI VRF SERVICE MANUAL
227
Step 15: Fill refrigerant.
Before filling refrigerant, check its manufacturer, package, and print information. Besides, check
refrigerant pressure and quality against the saturation pressure / temperature list.
1
)
Measure and check the pressure of the entire refrigerant product against the saturation pressure
/ temperature list. Verify temperature parameter. If the difference between the actual temperature and
the parameter value is 3°C(5.4
℉
) or more, the refrigerant quality is unsatisfactory.
Open all valves in
order that the
vacuum pump
extracts air through
all the valves
Gas pipe
Liquid
pipe
Balance
pipe
Low pressure
check valve
Oil checking
valve
If the
maintenance
work involves
multiple parts,
extract air of the
balance pipe
independently

Table of Contents

Other manuals for Gree GMV-120WM/B-F

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Gree GMV-120WM/B-F and is the answer not in the manual?

Gree GMV-120WM/B-F Specifications

General IconGeneral
BrandGree
ModelGMV-120WM/B-F
CategoryInverter
LanguageEnglish

Related product manuals