Construction Air-conditioning
Engineering allocation
Engineering cooperation meeting
Engineering meeting about
socket installation and insertion
Iron frame socket installation
Frame reinforcement
Working drawing
preparation
Pipe laying
Indoor unit installation
Refrigerant piping
Water drainage piping
Piping
Insulation
Electric
Outdoor unit
foundation
Outdoor unit
installation
Leakage test
Vacuum
dehumidification
Refrigerant charging
Decorative board
installation
Ceiling preparation
Concrete engineering on the
roof
Indoor and outdoor spaces
cleaning
Pilot run after power-
on
User manual delivery