Installation 
 
Notes 
(a) Distance between indoor unit and water tank should not exceed 5m levelly and 3m vertically. If 
higher, please contact with us. Water tank on lower and main unit on higher side is recommended. 
(b) Prepare the materials according to the above joints dimension. If cut-off valve is installed outside 
the room, PPR pipe is recommended to avoid freeze damage. 
(c) Waterway pipelines can‘t be installed until water heater unit is fixed. Do not let dust and other 
sundries enter into pipeline system during installation of connection pipes. 
(d) After connection of all waterway pipelines, perform leakage test firstly. After that, perform heat 
preservation of waterway system; meanwhile, pay more attention to valves and pipe joints. Ensure 
enough thickness of insulated cotton. If necessary, install heating device for pipeline to prevent the 
pipeline from freezing. 
(e) Hot water supplied from insulated water tank depends on pressure of water tap, so there must be 
supply of tap water. 
(f) During using, the cut-off valve of cooling water inlet of water tank should be kept normally on. 
4.8 Request of water quality