26
Specications are subject to change without prior notication From serial number 7027
12 Lubrication and Maintenance
12.1 Greasing
12.2 Before Use
12.3 Replacing Points & Shear
Pins
12.4 Tyres
12.5 Wheel bearings
12.6 Replacing Tines
12.7 Hydraulics
12.1 Greasing
There are several grease points on the Deep
Digger, these should be greased at the start
of every season, then as indicated and again
after cleaning the machine at the end of
season.
gure 1 Pull tongue 3 points weekly
gure 2 Wheel Hubs 4 points weekly gure 5 Wheel Lift Cylinders 2 points each weekly
gure 3 Wheel pivots 2 points weekly
gure 6 Hydraulic Crumble Roller 2 points each
weekly
gure 7 Crumble Roller 2 points weekly
gure 4 Level Lift Cylinder 2 points weekly