8
Specications are subject to change without prior notication From serial number 7027
Tyre Pressure Check tyre pressures (see section 8)
Wheel Nuts Check wheel nut torque (see section 8)
Level Machine Check the machine is level (see section 9)
Grease Machine All grease points must be greased before operation. See section 12 for
details of how to grease machine ensure all grease points function properly.
4 Pre-Delivery Checklist
Hydraulic Hoses and Fittings Check for operation and leaks, inspect hoses and ensure hoses are not
able rub on moving parts. Check hoses to tractor are routed correctly
Decals and Paint Check all decals are in correct location and in good condition, inspect paint
and touch up as required (see section 13 for decal locations)
Specications and Options Check pull tongue, points, lights, oversize sign, taillights, tyres, rollers
ensurethemachinehasthecorrectoptionsttedasperorder
Tighten Bolts Check bolts, see section 8 for torque chart
All checks done and correct Name Sign Date____/____/____
Comments