EasyManua.ls Logo

Gtec ZY120 - Page 24

Gtec ZY120
43 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
24
ZY120 6-20kVA (11) User Manual EN rev.04.doc
3. Operation
1) To perform the general operation, follow the stand-alone operating requirement.
2) Startup: The units transfer to INV mode simultaneously as they start up sequentially in
Line mode.
3) Shutdown: the units shut down sequentially in INV mode. When the last one completes
the shutdown action, each unit will shut down the inverter simultaneously and transfer to
Bypass mode.
It is easy to operate the equipment, with no previous training. You just need to read through
this manual and operate according to the instructions in it.
Rectifier/
PFC
Inverter
Bypass
Charger
UPS 1#
Rectifier/
PFC
Inverter
Bypass
Charger
UPS 2#
Utility Power Input
Load
Output 1# Output 2#
Parallel Communication
Cables
Fig 7. Parallel Installation Diagram

Related product manuals