Page #27 background image
3-10
Make sure that the PGND cable has been properly connected before powering on the switch.
Verifying the Installation
Before powering on the switch, check that:
z There is enough space for heat dissipation around the switch, and the rack or workbench is stable.
z The PGND cable is connected.
z The selected power module matches that required by the switch.
z The power cables are properly connected.
z All the interface cables are cabled indoors. If there is any cable wired outdoors, verify that socket
strip with lightning protection and lightning arresters for network ports have been properly
connected.

Table of Contents

Other manuals for H3C S5120-SI Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the H3C S5120-SI Series and is the answer not in the manual?

H3C S5120-SI Series Specifications

General IconGeneral
BrandH3C
ModelS5120-SI Series
CategorySwitch
LanguageEnglish

Related product manuals