EasyManuals Logo
Home>Hach>Measuring Instruments>HQ30d

Hach HQ30d Basic User Manual

Hach HQ30d
370 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #15 background imageLoading...
Page #15 background image
Clean the meter
The meter is designed to be maintenance-free and does not require
regular cleaning for normal operation. Exterior surfaces of the meter may
be cleaned as necessary.
1. Wipe the surface of the meter with a damp cloth.
2. Use a cotton-tipped applicator to clean or dry the connectors.
Replace the batteries
W A R N I N G
Explosion hazard. Incorrect battery installation can cause the release of explosive
gases. Be sure that the batteries are of the same approved chemical type and
are inserted in the correct orientation. Do not mix new and used batteries.
For battery replacement, refer to Figure 10. Make sure that the cover is
tightly closed to maintain the IP67 enclosure rating.
1. Pull the release tab on the battery cover and the remove the cover.
2. Remove the batteries.
3. Install 4 AA alkaline or 4 AA nickel metal hydride (NiMH) batteries.
Make sure that the batteries are installed in the correct polarity.
4. Replace the battery cover.
Figure 10 Battery replacement
1 Batteries 2 Release tab 3 Battery cover
Troubleshooting
Refer to the following table for common problem messages or
symptoms, possible causes and corrective actions.
English
15

Other manuals for Hach HQ30d

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Hach HQ30d and is the answer not in the manual?

Hach HQ30d Specifications

General IconGeneral
BrandHach
ModelHQ30d
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals