31
Installation
3.7 Connections to electronic boards
Note: Any loose connection wires should be bundled tightly together with the use of nylon cable ties.
3.7.1 Electronic boards connectors
Connectors P8 on the main board (Figure 15) and J7 on the measurement board (Figure 19)
are made of two parts. Push down carefully the black levers on either side of the connector and
pull it out securely. Perform all connections with these connectors unplugged. Once finished,
attach the connectors to the boards by pushing them firmly in place (levers up).
3.7.2 Main board connections
NOTICE
Potential Instrument Damage. Delicate internal electronic components can be
damaged by static electricity, resulting in degraded performance or eventual failure.
Figure 15 Main board
Figure 16 Connector P8
Figure 17 Connector P3
Connector P8:
1. RS-485 (signal A)
2. RS-485 (signal B)
3. PROFIBUS-DP (GND)
4. PROFIBUS-DP (+ 5 V)
5. PROFIBUS-DP (signal -)
6. PROFIBUS-DP (signal +)
7. PROFIBUS-DP (signal RTS)
8. Not used
9. Not used
10. Not used
11. System alarm relay (N.O.)
12. System alarm relay (N.C.)
13. System alarm relay (Common)
Connector P3
Ethernet RJ 45. Connect the instrument to the local network by passing an ethernet cable
through the ethernet cable gland (refer to Figure 9 on page 23 for the wall mount and
Figure 13 on page 26 for the panel mount) and connecting to the P3 connector illustrated
above.