Figure 2 Product components
1 SP-510 Hardness Monitor 5 Indicator solution
2 Installation kit
1
6 Magnesium sulfate solution
3 Maintenance kit
2
7 TitraVer
®
(EDTA) hardness titrant
4 Buffer solution
Installation
D A N G E R
Electrocution hazard. Always remove power to the instrument before making electrical connections.
D A N G E R
Multiple hazards. Only qualified personnel must conduct the tasks described in this section of the
document.
Install the instrument
Install this instrument on an indoor wall, away from direct sunlight.
• For a complete purge of the sample line during each cycle, install the instrument as close to the
sample point as possible.
• Leave sufficient clearance at the bottom and sides for tubing and cable connections.
Refer to Figure 3 and Figure 4.
1
Refer to the installation kit documentation for more information.
2
Refer to the maintenance kit documentation for more information.
8 English