EasyManua.ls Logo

Haier MRV II - 3. Outdoor installation

Haier MRV II
147 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Part 1
3.5 The bottom of steel bracket should be made from 6# channel steel.
3.6 The floor should be over 100mm higher than the ground, and there
should be the drainage around to ensure the unit not being immersed in
the water.
3.7. The unit should be fixed firmly with the anti-vibration cushion.
3.8. The outdoor should be as near the indoor as possible. Shorten the
pipe and decrease the bend pipe. Pipe length can not exceed the
permitted range.
3.9 Avoid the dangerous place which could be easily damaged by
monsoon, typhoon and earthquake, if possible, do not install the unit in
the air.
- 7 -

Table of Contents

Related product manuals