Four post workshop lift HAPP27
Version 5 WWW.HAPP.COM.AU
19
)
E"($#)%A#)$&355)F#(45)3+)F"3$C5)'+)$3&&#$%)835'%'3+)'+)F='"6'+,)
This is important as the installation of the cables will be easier with the runways raised and the cross beams will be easier
to move.
.55#4F"#)%A#)&=+*(75)3+%3)%A#)$&355F#(45) )
The runways are lowered onto the cross beams, it is important to note that the pulley on the main runway will need to be
slid into position, YOU CANNOT LOWER THE MAIN RUNWAY INTO POSITION, IT MUST BE LOWERED AT
AN ANGLE AT PUMP ASSEMBLY END AND THEN SLID INTO POSITION.
The main runway is typically installed first followed by the slave runway.
Figure: Pulley to be slotted in when assembling runway onto cross beam.
Whilst the runways are being lowered and slotted into position ensure the cables are routed into the cross beam, some of
the cables must be fed into the position during this step.