Figure: Builders level used to ensure column is plumb prior to marking / drilling holes for slave column.
I3=F"#)$A#$C)("")4#(5=#+%5)
Before drilling holes for the tru bolts ensure all measurements for hoist location and cross beam to column
clearances are correct. Once the holes are drilled it is difficult to modify the location.
If the holes are drilled in the wrong location it there are ways to fix this, but it is best to avoid this (obviously)
The nylon guide blocks on side of cross beam should be partially visible on sides of columns, The
rear nylon bush should be against the rear of BOTH columns.
J3"%)'+)$3"=4+5)
The hoist is supplied with 18mm Tru bolts. Use an 18mm masonry bit to drill the holes.