113
Index
Index
A
Adjustment of EVC operating unit, 44
Agitation, 64
Agitation before re-starting spraying, 64
agroparts, 115
Air brakes, 104
Altering the track gauge, 48
Anticorrosion oil, 33
Axle, 102
B
Before operation, 33
Boom, 27, 53
Readjustment, 77, 87
Boom and terminology, 27, 28
Boom hydraulic, 110
Boom lubrication, 73
Boom tilt, 55
Boom, manoeuvring, 55
BoomPrime, 22, 46, 86
Brakes, 104
Breakaway, 89
bypass valve, 22
C
Calibration, 91
CE identification plate, 17
Charts, 110
Chemical container cleaning, 21
Chemical container cleaning lever, 21
ChemLocker, 30
CIGAR CONNECTOR, 41
Clean filters, 69
Clean water tank, 21, 22
Cleaning, 65
Cleaning outside, 70
Clogging indicator, 20
Container Cleaning, 65
Container Cleaning device, 61, 62
Control unit, 63
Control unit brackets, 42
Conversion factors, 103
Cyclone Filter, 75
Cyclone pressure filter, 19
CycloneFilter, 20, 44
D
Declaration of Conformity, 9
Declaration of conformity, 9
Diagram - Liquid system, 23
Diagram - Liquid system, optional extras, 26
Dimensions, 101, 102
Disposal, 106
Drain valve, 85
Drawbar, 77
Driving technique, 28
E
EasyClean filter, 20
EasyClean suction filter, 19
EcoFill, 31, 64
Electrical connections, 107
Electrical Valve Control, 19
Emergency operation, 99
Equipment, 28
EVC control unit, 19
EVC distribution valve, 84
EVC junction box, 108
EVC operating unit, 108
External Cleaning Device, 19, 31
External Filling Device, 57
F
Filling chemicals through tank lid, 60
Filling liquid chemicals by HARDI TurboFiller, 61
Filling of clean water tank, 59
Filling of rinsing tank, 58
Filling of water, 56
Filling powder chemicals by HARDI TurboFiller, 62
Filling through tank lid, 57
Filling/washing location, 56
Filters, 19, 104
Frame, 17
G
General info, 15, 82, 95, 101
Grease, 92
H
Half boom width, 55
Half folded lengths, 27
HARDI MATIC, 19
Horizontal alignment, 89
Hose reel, 31
Hydraulic brakes, 104
Hydraulic slanting, 55
Hydraulic system, 97
Hydraulic systems, 26
I
Identification plates, 16
In-field diluting, 69
In-Line filter, 76
In-line filter, 19
IntelliTrack, 28, 91, 98, 111
J
Jack up the sprayer, 34
JOBCOM CONNECTOR, 41
L
Label explanation, 12
Level indicator, 84, 85
Liquid system, 18, 56, 96, 99
Load Sensing, 40
Lubrication, 73
M
ManualTrack, 28, 112
Mechanical problems, 99