EasyManua.ls Logo

Hatz 2-4L30 - Crank Handle Inspection;Repair; Start Mechanical

Hatz 2-4L30
174 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Version A 04.10.1
Standard crank handle:
This handle can be replaced at any time
by one with kick-back damping if this
becomes necessary or is required by
regulations.
Attention !
There is a risk of injury if the shaft of the
crank handle or its tubular handgrip are
worn.
Preparations:
Demontage:
Inspection / repair:
– Visual inspection.
– Inspect shaft 1 and tubular handgrip 2
for wear or breakage.
Note:
If the shaft of the crank handle is worn,
always renew the complete handle.
The tubular handgrip can be renewed
separately if necessary.
2
L / M . . 09.96
191
A 04.00 Start mechanical
A 04.10 Crank handle
2
1

Table of Contents

Related product manuals