EasyManua.ls Logo

Heatrae Sadia PremierPlus - 3.3 Electrical diagram(s)

Heatrae Sadia PremierPlus
28 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8
Figure 2: Schematic wiring diagram - basic 2 x 2 port valve system
Figure 3: Schematic wiring diagram - 3 port mid position system
3.3 Electrical diagram(s)
L
1
N
2
3
HTG
ON
DHW
ON
L
N
2
3
1
L
2
N
3
4
5 6 7 8 9 10
1
2 3
4
5 6 7 8 9 10
(Supply)
1
2 3
G
W
Bl
2
0 GY
3
G
1
Br Bl
2
0
L
N
Programmer Boiler Pump
Zone valve (HTG)
Terminal block
1
3 2
2
Room stat
Zone valve (DHW)
(supplied)
Junction box
NOTES: Control terminal numbering may differ from those shown.
Refer to instructions with controls selected.
A double pole isolating switch must be installed in the mains supply.
All earth connections must be connected back to the mains earth supply.
3
DHW
OFF
2
3
L
1
N
2
3
HTG
ON
DHW
ON
L
N
2
3
1
L
2
N
3
4
5 6 7 8 9 10
1
2 3
4
5 6 7 8 9 10
(Supply)
1
2 3
G
1
Br
Bl
2
0 GY
3
G
1
Br Bl
2
0
1
3 2
2
L
N
Programmer Boiler Pump
Zone valve (HTG)
Terminal block
Room stat
Zone valve (DHW)
(supplied)
Junction box
NOTES: Control terminal numbering may differ from those shown.
Refer to instructions with controls selected.
A double pole isolating switch must be installed in the mains supply.
All earth connections must be connected back to the mains earth supply.
3
2
3