EasyManua.ls Logo

HEIL F8MVL - Sequence of Operation

HEIL F8MVL
54 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
47
441 01 2121 01
The wall thermostat “calls for heat”, closing the R−to−W
circuit. The furnace control performs a self−check, verifies the
low−heat and high−heat pressure switch contacts LPS and
HPS are open, and starts the inducer motor IDM in
high−speed.
a. Inducer Prepurge Period
(1.) If the furnace control CPU selects low−heat
operation the inducer motor IDM comes up to
speed, the low−heat pressure switch LPS
closes, and the furnace control CPU begins a
15−second prepurge period. If the low−heat
pressure switch LPS fails to remain closed the
inducer motor IDM will remain running at high−
speed. After the low−heat pressure switch re−
closes the furnace control CPU will begin a
15−second prepurge period, and continue to
run the inducer motor IDM at high−speed.
(2.) If the furnace control CPU selects high−heat
operation, the inducer motor IDM remains run-
ning at high−speed, and the high−heat pres-
sure switch relay HPSR is de−energized to
close the NC contact. When sufficient pressure
is available the high−heat pressure switch HPS
closes, and the high−heat gas valve solenoid
GV−HI is energized. The furnace control CPU
begins a 15−second prepurge period after the
low−heat pressure switch LPS closes. If the
high−heat pressure switch HPS fails to close
and the low−heat pressure switch LPS closes,
the furnace will operate at low−heat gas flow
rate until the high−heat pressure switch closes
for a maximum of 2 minutes after ignition.
Figure 55 − Cooling (A/C) or Continuous−Fan (CF) Airflow Selection Chart
SWITCH SW2 or SW3 POSITIONS
SWITCH SW2 or SW3 POSITIONS
b. Igniter Warm−Up −At the end of the prepurge peri-
od, the Hot−Surface Igniter HSI is energized for a
17−second igniter warm−up period.
c. Trial−For−Ignition Sequence −When the igniter
warm−up period is completed the main gas valve
relay contact GVR closes to energize the gas valve
solenoid GV−M. The gas valve solenoid GV−M per-
mits gas flow to the burners where it is ignited by
the HSI. Five seconds after the GVR closes, a
2−second flame proving period begins. The HSI
igniter will remain energized until the flame is
sensed or until the 2−second flame proving period
begins. If the furnace control CPU selects high−
heat operation, the high−heat gas valve solenoid
GV−HI is also energized.
d. Flame−Proving − When the burner flame is proved
at the flame−proving sensor electrode FSE, the in-
ducer motor IDM switches to low−speed unless the
furnace is operating in high−heat, and the furnace
control CPU begins the blower−ON delay period