EasyManua.ls Logo

HELIX Compressor 9600 - Page 46

HELIX Compressor 9600
59 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9600 Compressor Installation, Operation, and Maintenance
P/N 8040540 5-3
C
HELIX TECHNOLOGY CORPORATION
-
TI C
RY
OG
EN
ICS
9. Ensure that the pressure gauge reads the proper value as shown in
Table 4-1. If additional gas pressure is required, refer to Adding
Helium within this section. If gas pressure needs to be reduced,
refer to Reducing Helium Pressure within this section.
10. Record the adsorber replacement date on the label as shown in Fig-
ure 5-2, and also note that the next adsorber replacement should be
performed every three years.
Figure 5-2: Adsorber Location within the 9600 Compressor (Rear Panel Removed)
ADSORBER
MOUNTING
BOLT
ADSORBER
DATE

Table of Contents