Parts Included
Tools Required
HermanMiller
Mora
™
System Overhead Storage Installation
and Disassembly for Recycling Instructions
How to assemble your Overhead Storage
CH., CH. Wall Mounted Cases)
Power Driver
Level
Overhead Storage Glovebox/Paper Towel
Overhead Storage
CH Wall Cleat
Sloped Top Overhead
Storage
Step 1
Phillips Bit
Stud Finder
Laser Level &
Tripod
Drill Bit
Tape Measure
Pencil
Safety Glass
. Position Wall Cleat onto wall.
. Measure distance (. for ” high , . for ” high cabinets)
from Floor to center of bottom holes in wall cleat.
. Measure ” in from where case is to be located to nd the vertical
position of wall cleat. Mark Location.
Wall Cleat
Cabinet
Floor
Note: Please refer to Mora System planning guide for dierent wall
constructions.
”
. (”)
. (”)
CH. Toggle Bolts
Additional Product Needed - Sold Seperately
CH. Ganging Hardware
Note: Field supplied #-/” Flat Washer.
Step 2
Mark Holes
. Set up self-leveling laser to match mark, on wall.
. Align Wall Cleat to level line and distance from outside cabinets. Using
Cleat as template, mark mounting holes.
HermanMiller for Healthcare Assembly Instructions1
1BJM4F rev D