© 2005 PAT GmbH · D-76275 Ettlingen · Hertzstr. 32 - 34 · ++49 (0) 7243 709-0 · FAX ++49 (0) 7243 709-222 · Email: pat.ettlingen@pat-group.net 27
24 160 19_0106E_Rev D.doc / 2005-06-27 / rk.
13. PROCEDURES
13.1 EPROM Location and Installation Procedure
• Ensure the notch is in the correct direction.
• The DATA,TLK, and SYSTEM EPROM’s fill the bottom of the socket as shown by the arrows.
• Place EPROM’s in the correct EPROM socket as shown.