42
CP-X2511N(C15I-25N2) / CP-X3011N(C15I-30N2) / CP-X4011N(C15I-40N2) / CP-X2011N(C15-20N2) / ED-X45N(C15-20N2)
Wiring diagram 4
Wiring around panel duct 1
(1) Wire #3010, #3020 and E1
(2) Wire CNFL2 and CNBAT
SENSOR board
Connect the CNFL2 to the
SENSOR board, or the CNBAT to
the BATTERY board before
attaching each of boards to the
projector when you replace the
each of them.
BATTERY board
CNBAT
CNFL2
Underside of Panel Duct
Claw
#3010
L=50±10mm
Put the #3010 (RG panel fan) and the #3020 (B panel fan) to the bottom case.
Stick tapes (L=20mm) about 50mm
away from the claws in order to
attach the cables to each of fans.
Claw
L=50±10mm
#3020
#3000
L=30±5mm
L=50±5mm
Insert the #3010 cable and the
#3020 cable into the slits, and
style wires in order not to let them
loosened. Otherwise, they may be
pinched into each of fans.
Fasten the E1 (temp. sensor)
underneath the panel duct with
a screw.
CNFL2
Attach the SENSOR board to the outside of the Panel Duct,
and wire the CNFL2 cable to the back side of the Panel Duct.
Pass the CNFL2 cable through the slits pointed by the
arrows.
E1
Tie up the wires of #3000
with a tape ZTP3.