EasyManua.ls Logo

Hitachi RAS-4-HNPE - Checking Procedure for Main Parts; Procedure for Checking the DIP-IPM Inverter for Indoor and Outdoor Units

Hitachi RAS-4-HNPE
480 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8. Troubleshooting
277
SMGB0079 rev.0 - 01/2013
8
8.4 Checking procedure for main parts
8.4.1  Procedure for checking the DIP-IPM inverter for indoor and outdoor units
RAS-(3-6)H(V)N(P/C)E
High voltage discharge work for replacing parts
C A U T I O N
Electricalhazard.Riskofelectricalshock.Performthishighvoltagedischargeworktoavoidanelectricshock.
1 Turn OFF the main switches and wait for three minu-
tes. Make sure that no high voltage exists. If LED201
is ON after start-up and LED201 is OFF after turning
OFF power source, the voltage will decrease lower
than DC50V.
2 Connect connecting wires to an electrical soldering
iron
3 Connect the wires to terminals, P and N on DIP-IPM.
(The discharge voltage can perform even when con-
necting the wires to terminals
#1(P) and #3(N) of
connector “PCN201”) => Discharging is started, re-
sulting in hot soldering iron. Pay attention not to short-
circuit between terminal P(+) and N(-)
4 Wait for 2 or 3 minutes and measure the voltage once
again. Check to ensure that no voltage is charged.
DIP-IPM
Connecting Wires
Electrical
soldering iron
Plug
Inverter module checking procedure
Rectier circuit of inverter PCB
Internal circuit of rectied part of DIP-IPM
Remove all the terminals of the inverter PCB before
checking.
Non-faulty if [1] – [8] are checked and satised.
Measure with 1 kΩ range of a tester.
R
S
T
52C
N O T E
DONOTuseadigitaltester.

Table of Contents

Related product manuals