4.10. Heat storage operation by external order
It is a control that runs unit by External Thermostat order. It forces unit to work at
full load with no capacity control. (It is valid only at remote setting)
a) Dip Switch (DSW1) on the PCB
is set as follows before power ON.
b) Connection to external Thermo
Connection to Chiller unit is as follows.
Connect with terminal No. 40, 41 of TB3 within the electrical box.
Heat storage operation by
Wiring in local (parts: purchased in local)
Remove it in case remote controller switch is used
(*) In case of only heat storage operation, wiring of ( ) part is not necessary
(*) In case of only heat storage operation, wiring of ( ) part is not necessary