EasyManua.ls Logo

Hitachi RPK-0.8FSNH2M - Page 10

Hitachi RPK-0.8FSNH2M
168 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2
UNITS INSTALLATION
4
3. Mounting on a Concrete Wall or a Concrete Block Wall
Attach the mounting bracket to the wall with anchor bolts
as shown below.
Plug size
Nr.
(0.8-2.0)
HP
(2.5-4.0)
HP
M4~M5
4
5
4. Bottom cover for 0.8/1.0/1.5/2.5/3.0/4.0 HP can be
removed by pushing 1 and 2 parts.
5. Mounting the Indoor Units
Hook the indoor unit to the mounting bracket,
maintaining the indoor unit upright. Fix the bottom cover
and the mounting bracket by three screws
RPK-0.8/1.0/1.5/2.5-4.0 HP
RPK-2.0 HP
6. Check to ensure that the unit is completely hooked onto
the mounting bracket. If not, it may drop from the
bracket, resulting in a serious accident.
Removing Front Panel (RPK-(0.8-1.5) HP)
In order to connect the refrigerant piping, wiring and to
check drain water flow, removing the right side cover is
needed. Perform this work according to the following
instructions. Pay an attention to the resin components not
to scratch.
1. Open the front panel and remove two screws
2. Slowly pull the lower side of the front panel at your side
by paying attention to the air outlet part without touching
the outlet grille.
Slightly lift the front panel upward in order to release the
combined parts (three parts) of upper side of the front
panel.
NOTE:
Do not hit the front panel when removing it, otherwise
the body will be broken.
Putting back Front Panel
1. Firstly put back the upper side of the front panel (three
parts), and then fix the hook on bottom center part
2. There are stoppers inside of the front panel. Check to
ensure that there is no gap between front panel and unit
body.
Screw
Plug
Mounting
Bracket
Extrusion
Hook
Mounting
Bracket
Hook
Hook
Mounting
Bracket
Hook
Front Panel
Body

Table of Contents

Related product manuals