EasyManua.ls Logo

Hitachi VSP G/F350 - Page 6

Hitachi VSP G/F350
28 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6. Tighten the four screws on the left mounting rail.
7. Repeat steps 1 through 6 to attach and secure the right mounting rail to the right side of the rack.
8. Position the controller so the front faces the front of the rack, and then slide the controller gently onto the rails.
Stop sliding when the mounting flanges on the front of the controller touch the vertical face of the rack.
https://knowledge.hitachivantara.com/Documents/Storage/VSP_G130_GF350_GF370_GF700_GF900/88-03-0x/Installation/0…
Updated: Wed, 20 Dec 2023 21:36:41 GMT
Powered by
6

Related product manuals