65
PMEN0645 rev.0 - 04/2023
8
TESTRUN/AIRPURGE
COMMISSIONING
Example for PC-ARFH2E
In case of test run, user can also select the mode of the test (cooling or heang).
When user conrms the test run or the air purge, the YUTAKI user controller sends the order to the
indoor.
During the execuon of this test, the following screen is shown:
• When the test starts, the user controller will exit from the installer mode.
• User can cancel the test run regardless of the me le for test nishing.
• The Test Run icon is shown in the nocaons zone, but the nocaon of this test run is taken
from H-LINK.
When test run has nished, an informaon message is displayed in the screen, and pressing
accept, the user returns to the global view.
NOTE
• When commissioning and installing the unit, it is very important to use the “Air purge” funcon
to remove all the air in the water circuit. When the air purge funcon is running, the water
pump starts the automac air venng roune which consists of regulang the speed and open/
close congured 3-way valve to help to evacuate air from the system.
• For Outdoor test run, refer to Outdoor Unit Installaon Manual.
• If there is a Heater or a Boiler installed, disable the operaon before running the test run.