EasyManua.ls Logo

Hobart FT900 - OPERATION; Machine Preparation

Hobart FT900
28 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
– 3 –
Pump Intake Screens must be put on
holders at each pump intake (Fig. 1).
Fig. 1
Strainer Pans must be in place on top of
each tank (Fig. 2).
Fig. 2
End Caps must be correctly installed at
ends of all Wash Arms (Fig. 4).
Fig. 4
Wash Arms must be properly installed
and latched in place (Fig. 5).
Fig. 5
The Final Rinse Arm (and Dual Rinse Arm when
present) must be properly installed (Fig. 7).
Fig. 7
Curtains and drainback pans must be in their
proper places, refer to pages 11 – 14.
Strainer Baskets must be in place in
Strainer Pans (Fig. 3).
Fig. 3
The Flush Arm at load end must be
properly installed (Fig. 6).
Fig. 6
Operation and Care of
FT900 SERIES DISHWASHERS
SAVE THESE INSTRUCTIONS
OPERATION
MACHINE PREPARATION — Check before beginning operation.
Open the machine doors and make sure all components are in their proper operating positions.

Related product manuals