Holtkamp Electronics SUNCASH engl. techn. Stand 04.2016 4047_04.2016 V09.2019
- 11 -
9.5 Electrical connection
The electric connection may only be carried out by
qualiedandauthorisedpersonnel!
The electrical connection must be installed complying to the
current local VDE regulations. With a permanent connecti-
on the all-pole mains interrupter switch contacts must have at
least a 3mm gap. Before starting with the electrical connection
theappropriatemainscircuitmustbeswitchedo󰀨.Activatethe
appropriate immobilising switch, remove the fuse or trigger the
mains safety fuse.
From a standard wall socket the supplied mains supply cable is
inserted through one of the two drilled holes to achieve the elec-
tric connection. After the electrical connection has been achie-
ved, can the SunCash be re-assembled.
Cable entrance
IEC connector
Power plug
Cable entrance
9.6 Operatingforthersttime
After successful installation the SunCash can be operated. For
thispurposethemoneyhopperandcarddispensermustbel-
led.Themoneyhopperiseasilylledfromabovebutonlyuptoa
maximumof1cmbelowthetop.Thecarddispenserisalsolled
from above, to a maximum of 1cm below the top lip. It makes no
di󰀨erencewhichwaythecardsareinserted.Theattachedchip
cardcovermustlayatonthechipcardstacktopreventprob-
lems by a low card stack. As soon as the mains circuit and the
internal mains switch have been switched on, appears in the dis-
play for about 2 seconds an information about the operating type
of your SunCash and the software version used (e.g. Holtkamp
SunCash version X.x -), after that appears in the display ‘money
changer ready’. SunCash is now ready for use and can now be
programmed to your wishes. You should carry out an intensive
test to ensure that the programming has been properly carried
out. After the test run, the counters should be reset to ensure
correct accounting. Generally speaking also for further operati-
on, every time the device is opened, the mains supply must be
switchedo󰀨bytheinternalmainsswitch!
Consider the great volume and therefore the consider-
able weight (up to 50 kg), of the coin box when it is
lledwithcoins.Thereforedonotremovethefullcoin
box out of the grooves. To remove the money, it is suf-
cienttoremovethecoinboxtothestop.
Take into account that the installed software has been set up
for the installed components and there adjustments. That means
thatinstallingothercomponentsorchangingthecoinhopperl-
ling with other sorts of coins will result in complications. Should
you want to install or change components like dispenser, hopper,
electronic multiple bank note reader, electronic coin tester, chip
cardcontactunitorllthecoinhopperwithadi󰀨erentcoinsort,
then please ask us for information! Should you for any reason
removeacomponentoutoftheSunCash,switcho󰀨themains
supply. Either direct at the fuse box or with the installed mains
switch!