ID50 Series Panel - Installation, Commissioning & Configuration Manual
Contents
ii997-263-000-11, Issue 11
January 2010
3.3.1 Screen Termination 22
3.3.2 Ferrite Sleeves (Optional) 22
3.4 MICC Cables 22
4 Commissioning 23
4.1 Introduction 23
4.2 Preliminary Checks 23
4.3 Internal Checks 24
4.3.1 Jumper Link Options 24
4.4 External Wiring Checks 25
4.4.1 Loop Wiring 26
4.4.2 RS485 Communications Link 27
4.4.3 DC Auxiliary Output 27
4.4.4 Sounder Circuit Outputs 28
4.4.5 CFG Outputs C and D 30
4.4.6 -VE Outputs 31
4.4.7 Digital / ÜE Inputs 31
4.4.8 Switch Connections 31
4.5 Powering the Panel 32
4.5.1 Start-up Language Selection 32
4.5.2 Batteries 33
4.6 Configuration and Handover 34
4.7 Commissioning Tests 35
4.7.1 Test LEDs 35
4.7.2 Test LCD 35
4.7.3 Test Zones 35
4.7.4 Test Auto High Test 35
4.7.5 Test Outputs 35
4.7.6 Test Buzzer 35
4.7.7 Test Keyboard 35
4.8 Sensors and Modules 36
4.8.1 EN54 Requirements 36
4.8.2 Loop Wiring Testing 36
5 Configuration 37
5.1 Introduction 37
5.2 Navigation and Number Entry 37
5.3 Level 2 Configuration Options 37
5.4 Level 3 Configuration Options 38
5.5 Setup Options 39
5.5.1 Panel Options 39