Chapter
7,
When
Your
Computer
Arrives
Appendix A
Appendix B
Discusses
the
final
preparation
for system arrival, coor-
dinated
deliverie.s, arrival dates, how
to
check for dam-
age in shipment, unpacking
the
cartons,
and
scheduling
the
installation of
HP
9000
Computer
Systems.
Lists
product
specifications for electrical requirements,
heat
generation,
temperature
and
humidity require-
ments,
and
shipping dimensions.
Contains
forms
to
use for preparing
the
site, such as
Pre-
Installation Worksheet, Shipment Scheduling Form,
and
a Site Completion Checklist.
Product
Information
17