1 Overview
System conguration
Your printer is supplied almost fully assembled and ready for the simple installation procedures performed by
your support engineer. It comes complete with printheads and a printhead cleaning roll.
Documentation
The following documents are available:
● Site preparation guide (this document)
● Introduction information
● User guide
● Legal information
● Limited warranty
Site preparation overview
This guide should assist in the following planning considerations:
● Modications to the installation area
● Site accessibility
● Emergency exits
● Planning the production area
● Mechanical, electrical and environmental specications
● Computer and network connectivity
● Contracting a specialist mover with a forklift and/or suitable moving equipment
● Contracting an electrician
● Environmental, health, and safety
ENWW System conguration 1